Let AI handle your mailboxes, calendars, contacts, notes, and tasks — privately, on any inbox, with any AI.

Free — 14 days of full Pro No card required

Bring your AI into Thunderbird with atbridge.ai — manage your mailboxes, calendars, contacts, notes, and tasks as one, from a native UI, MCP, or the CLI.

Any AI — Claude · GPT · Gemini · Mistral · DeepSeek · Kimi · Grok · Groq · OpenRouter · NVIDIA NIM · any OpenAI-compatible · local models (Ollama) · Claude Code CLI · Antigravity CLI · Codex CLI  ·  Any client — Claude Desktop · Cursor · VS Code · JetBrains · Antigravity · Codex · Cline · any MCP agent · CLI  ·  Any inbox — Gmail · Outlook · iCloud · IMAP, via Thunderbird

Use it where you already work.

atbridge inside Thunderbird: the atbridge AI Chat picks an AI provider, then answers how many unread emails are in each mailbox across several accounts.
Work every mailbox from inside Thunderbird with the atbridge AI Chat — pick the AI of your choice (any provider, or local Ollama) and ask across all your accounts at once.
atbridge in Thunderbird: with an email open, the atbridge AI Chat dock opens the prompt library, picks "Summarise the open email", and returns a 3-point summary of what the sender wants, anything time-sensitive, and what to do.
Prompt library in the atbridge AI Chat — one click turns a saved prompt (“Summarise the open email”) into a structured answer about the email you're reading. Curate your prompts once; reuse them across every mailbox.
atbridge in Thunderbird: the atbridge AI Chat runs the /from and /clashes skills — instant slash-commands over emails and calendars, no AI tokens.
atbridge Skills — instant slash-commands in the atbridge AI Chat: /from, /clashes, /today, /week. Deterministic answers across emails + calendars, no AI tokens spent.
In Thunderbird

atbridge AI Chat

Open the atbridge AI Chat right inside Thunderbird, pick the AI of your choice — any provider, or a private local model — and work every mailbox at once: triage, summarise, draft and ask across all your accounts. Skills (/from, /today, /clashes) answer instantly with no AI tokens spent, and Fast Actions turn any reply into a note or an email draft in one click.

atbridge atbridge Notes: an open note is attached to the docked AI Chat via Use as Context; the AI returns an improved launch plan, and Save to Notes appends it back into the note.
atbridge Notes ↔ AI Chat — open a note, Use as Context, ask the AI to improve it, then Save to Notes appends the reply straight into your note. Your local, AI-native markdown workspace.
atbridge atbridge Notes: a rich weather note (voice memo, temperature chart, formula, image) — Transcribir convierte el memo de voz en texto, then To Email Draft renders the whole note as a branded HTML email (chart + formula rasterised) in the Thunderbird compose window.
atbridge Notes → Email — Transcribe a voice memo, then To Email Draft renders the whole note (chart, formula, image and all) as a branded HTML email in one click. A local, AI-native markdown workspace.
In Thunderbird

atbridge Notes

atbridge Notes is a local, AI-native markdown workspace built into Thunderbird: keep folders of .md notes in a real editor with a docked AI Chat. Use as Context hands the open note to the AI; ask it to improve or extend the note, then Save to Notes appends the reply straight back in. Everything stays on your machine.

atbridge in Thunderbird: the Fast Actions menu on an open email saves it to atbridge Notes as a clean markdown note in one click.
Fast Actions — turn the open email into a note in one click: To Note saves it to atbridge Notes as clean, source-linked markdown. No copy-paste.
atbridge in Thunderbird: Fast Actions extracts the action items from an open email into a checklist, then creates them as Thunderbird tasks in one click.
Fast Actions — Extract action items reads the open email and turns each step into a task; review the list, then Create tasks drops them straight into Thunderbird.
In Thunderbird

atbridge Fast Actions

One click on an open email or note fans it out across the suite — To Note, Extract action items → Tasks, To Calendar Event, To Contact. Fast Actions interconnect your emails, notes, tasks, calendars and contacts, so nothing needs copy-paste.

atbridge in Claude Desktop (MCP): the assistant reads delivery-progress emails via atbridge and summarises how much of the work is done.
Ask Claude Desktop in plain language — it works your inbox through atbridge (MCP), running locally on your machine. atbridge never routes your mail through its own servers.
Claude Desktop runs a user's own 'Daily agenda' skill that calls atbridge over MCP to fold unread mail and today's calendar into a morning brief.
Run your own Claude skill: a “Daily agenda” skill calls atbridge (MCP) to fold unread mail + today's calendar into one morning brief — clashes flagged. Build a skill once, run it daily.
For AI power users

AI agent desktop clients

Ask Claude Desktop — or any agent that speaks MCP locally — in plain language. It reads and works your inbox through atbridge, running on your machine; your mail is never routed through our servers.

The full mailbox — not a read-only summary.

Mailboxes, calendars, and contacts — your AI gets the same read and write powers you have, not a one-way digest.

✉️ Mail, end to end

Read, send, reply, forward, search, move, delete, and tag across every account. Compose in plain text, HTML, or Markdown.

📅 Calendar & scheduling

Create, update, and delete events across your calendars — with cross-calendar clash detection so your AI never double-books you.

👥 Contacts & address book

Search, create, and update contacts across every address book Thunderbird holds — so "email Maya" just works.

🔒 Local-first

The bridge runs on your machine, listening only on 127.0.0.1 — your mail is never routed through atbridge.ai's servers. A direct action runs locally in ~5 ms — faster than a cloud round-trip, with no network hop — and ~72% lighter on tokens (≈3.5× cheaper per fetch) than a cloud bridge.

🔌 Your LLM, your choice

Activate any LLM (large language model) provider right in the Thunderbird extension — OpenAI, Anthropic, Gemini, Mistral, Groq, OpenRouter, NVIDIA and more, or local Ollama. Pick a provider and model in the atbridge panel; your API key is encrypted on-device, sealed by your OS keychain. Or run the model locally with Ollama — private, on-machine AI.

🖥️ Any surface

Drive atbridge.ai from wherever you work: the atbridge panel inside Thunderbird, an IDE (Cursor, VS Code, JetBrains, Antigravity), Claude Desktop or any MCP agent, Claude Code, or the terminal — same ops everywhere.

🌐 Any provider

Anything Thunderbird supports: Gmail, Outlook, iCloud, ProtonMail Bridge, FastMail, your company IMAP.

💸 Cheaper to run

Replies are lean and text-first, so your model processes a fraction of the tokens per task — the LLM bill you already pay drops. (atbridge.ai plans & quotas are separate — see pricing.)

🛠️ Built for builders

A CLI, JSON I/O, stable schemas, and a built-in MCP server. Drop it into your scripts or agent framework in one command.

There's more to atbridge.ai

The developer surfaces and topic deep-dives each have their own page.

Simple pricing. Local always.

Start free — 14 days of full Pro, no card. Early-bird prices below are held while subscribed for anyone who subscribes before Nov 1, 2026.

Free

€0 / month

 

 

Forever — no card required

  • 14-day trial: unlimited ops + MCP
  • After trial: 20 ops / monthAn operation is one action atbridge makes on your data in Thunderbird — a search, send, reply, move, or a new event or contact. Talking to your AI provider in AI Chat (the model's thinking and its replies) is never counted — you pay your provider for that directly.
  • 1 device
  • 1 bound email account
  • AI from your IDE / terminal (Cursor, VS Code, CLI)
  • atbridge AI Chat (AI inside Thunderbird — standalone)
  • atbridge Notes — a private local notes app (Markdown, diagrams, LaTeX, audio; basic editor)
  • atbridge MCP keeps working after the trial (from your 20-op budget)
  • "Sent with atbridge" footer on outbound

Personal

€4.99 / month

€7.99 standard price after Nov 1

Excl. VAT

Early-bird · held while subscribed

  • 300 ops / month (one budget — mail, MCP & AI Chat actions)An operation is one action atbridge makes on your data in Thunderbird — a search, send, reply, move, or a new event or contact. Talking to your AI provider in AI Chat (the model's thinking and its replies) is never counted — you pay your provider for that directly.
  • Up to 2 devices
  • Unlimited email accounts
  • AI from your IDE / terminal (Cursor, VS Code, CLI)
  • atbridge MCP (let agents call your inbox)
  • Bring your AI subscription (Claude Code / Codex — your own subscription)
  • Docked atbridge AI Chat (beside mail, notes & compose)
  • Fast Actions (one-click: email → task, event, contact, reply)
  • 10 atbridge Branded Email drafts / month
  • Full atbridge Notes editor (auto-save, chart editing, transcription, docked chat)
  • Community support

Enterprise

Talk to us / per seat

 

 

For teams & organisations

  • Everything in Pro, for every seat
  • Centrally managed for your organisation
  • Simple per-seat pricing
  • Invoiced to your company
  • Onboarding help
Talk to us →

Cancel anytime · Prices excl. VAT · VAT added at checkout by Stripe based on your country

Free Personal Pro Enterprise
Ops per month
Each atbridge action on your data — AI-provider calls in Chat aren't counted.
20
(unlimited in trial)
300UnlimitedUnlimited
Devices1255 / seat
Email accounts1 (bound)UnlimitedUnlimitedUnlimited
AI from your IDE / terminal✓✓✓✓
MCP (for AI agents)✓ (from budget)✓ (from budget)✓✓
↳ atbridge Notes from outside Thunderbird (inside Thunderbird: every plan)Trial only✓✓✓
atbridge Branded Email—10 / moUnlimitedUnlimited
Save your own templates——✓✓
Per-item AI access levels——✓✓
atbridge AI Chat (AI inside Thunderbird)✓ (standalone)✓UnlimitedUnlimited
↳ docked (beside mail & notes)—✓✓✓
↳ web search in chat—✓✓✓
↳ files attached per request1UnlimitedUnlimitedUnlimited
↳ voice typing (dictation)——✓✓
Fast Actions (one-click AI: task / event / contact / reply)Trial only✓✓✓
Skills (/today, /clashes, /week …)Trial only✓✓✓
atbridge Notes editor (local notes workspace)BasicFullFullFull
Notes: voice notes + Plug-as-Context——✓✓
Central management———✓
"Sent with atbridge" footerYesNoNoNo
SupportCommunityCommunityPriority emailPriority email

An operation is one action atbridge makes on your data in Thunderbird — a search, send, reply, move, or a new event or contact. Talking to your AI provider in AI Chat (the model's thinking and its replies) is never counted — you pay your provider for that directly.

Questions

What can I do with atbridge.ai?

Just say what you need in plain language. A few ideas to try:

Triage my inbox.
atbridge.aiArchives the newsletters and receipts, flags the few emails that actually need a reply, marks the rest read.
Draft replies to everyone still waiting on me.
atbridge.aiFinds unanswered threads from the past week and writes a contextual reply to each — saved as drafts for you to review and send.
Send the Q3 report to the board.
atbridge.aiTurns your Markdown into a clean, formatted HTML email and sends it to the whole board list — signature and all.
Find the invoice from March and forward it to accounting.
atbridge.aiSearches every connected account, finds the right message, and forwards it with a short note.
Summarize what I missed this week.
atbridge.aiReads unread mail across all your inboxes and hands back one paragraph — who needs what, and by when.
Reply to Sara: yes to Friday at 3.
atbridge.aiOpens the thread, writes the reply in your voice, and sends it — or saves it as a draft for you to send.

That's a taste — anything you can describe across your mailboxes, calendars and contacts is fair game. Browse the docs for the full picture →

Does my email leave my machine?

No. atbridge.ai runs as a local process. Your AI talks to it over a localhost socket — not the public internet. We don't operate servers that touch your email. The only thing our servers do is verify your subscription.

Is atbridge.ai faster and cheaper than a cloud MCP?

Yes, measurably. Because atbridge.ai runs locally, a direct operation — reading a message, listing folders — completes in single-digit milliseconds — faster than the network round-trip a cloud tool pays before it even starts work. And because it returns plain text instead of full HTML by default, a typical fetch uses about 72% fewer tokens (~3.5× cheaper) with no unsolicited HTML.

What counts as an "operation"?

One operation = one action that fetches or changes mail: a search, a list, a send, a reply, a forward, a move, a delete, a contact create/update. Follow-ups that don't fetch new data — opening a message you just listed, reading a thread you already pulled, viewing a contact you searched — do not count. Plan and bridge meta-commands never count.

Is VAT included in the price?

No — the prices shown are exclusive of VAT. VAT is calculated and added at checkout based on your billing country. EU buyers will see their applicable rate applied automatically by Stripe. You'll see the final amount including VAT before completing payment.

What happens when my 14-day Free trial ends?

You keep CLI access and 20 operations per month, forever. You lose MCP (so AI agents can no longer call you directly — but the CLI still works). Outbound mail gets a small "Sent with atbridge" footer. Upgrade anytime to remove both.

What does the early-bird price get me?

If you subscribe before Nov 1, 2026, you lock in €4.99 (Personal) or €9.99 (Pro) per month — forever. Stripe never auto-migrates subscribers to a new price, so as long as your subscription stays active, your monthly cost never changes. After Nov 1, the same plans cost €7.99 and €14.99 for new subscribers.

Can I pay annually?

Yes — annual billing opens on Nov 1, 2026 (when the early-bird window ends). Annual works out to two months free vs. paying monthly. Early-bird subscribers stay on monthly billing — the held while subscribed monthly rate is already the best deal we offer.

Do I need to be technical to use it?

No. You install the atbridge add-on in Thunderbird from the .xpi file, then a setup wizard walks you through the rest — setting things up and connecting the AI of your choice, step by step. From then on you just talk to your assistant in plain language. No coding required.

Which AI tools work with it?

Anything that can run a command or speak MCP: Claude Desktop, Claude Code, Cursor, Cline, Aider, Ollama, or your own agent. If it can run a shell command, it works.

Can I use a fully local LLM?

Yes. Run atbridge.ai with Ollama and a local model — Qwen2.5-14b-instruct, Llama 3, Mistral and others work well. Your AI runs on your machine, so no email content goes to any AI provider — zero cloud AI, zero API keys. (Sending mail still uses your normal mail server, as always.) The trade-off is inference speed — it depends on your hardware. A modern Apple Silicon Mac or a fast GPU makes it practical for everyday use. This is the maximum-privacy configuration.

Why Thunderbird?

Our goal is to bring local AI email to as many people as possible, and Thunderbird gives us the widest reach to start: it's free, runs on every platform, works with any inbox via IMAP, and is the only mature email client that's genuinely extensible via open WebExtension APIs. That means one integration, any provider — Gmail, Outlook, iCloud, IMAP — for every user. We're always thinking about how to reach more people.

What does "device" mean?

One machine you've activated your plan on. Free covers 1, Personal covers 2 (e.g. laptop + desktop), Pro covers 5. You can move your plan between machines from your account.

Does my AI send email without asking me?

That's up to you. You can have it save everything as drafts for review, or let it send directly. Write access for agents is off by default and you opt in explicitly.

Can I cancel?

Yes, anytime, from the Stripe customer portal linked in your account. Your plan stays active until the end of the billing period.

Stop doing email by hand.

Give your AI assistant the keys to your inbox — locally, privately, and faster than any cloud bridge.

Get started